Secware Posted July 15, 2016 Share Posted July 15, 2016 I bought a CQR SC570/WH Surface Contact (SC570/WH/MD/MULTI/G3) from your shop.Installation instructions are a bit unclear : to wire this contact as a single detector, it is written that one link from each row (Tamper and Switch) must be cut. But just before, they wrote that "at least" one link from each row must be cut. And there is a table which lists Texecom (I have a Texecom Premier 24 control panel) in column B.So, now I'm wondering: should I cut only column B links or should I cut all links except column B? Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.